Give step-by-step solution with explanation and final answer:3. (a) Machines in a repair station arrive at rate of forty
per hour and workman can cope with sixty per
hour for an eight-hour day. You are required to
calculate.
(i) The average time in the system.
(ii) The average length of the queue of
machines that form from time to time.
(iti) The implied cost of machine’s time if owner
of the system has rejected a faster service
which could raise cost by Rs. 800 per day
and would raise the service to eighty per
hour. (2+2+4=8)
Question:
Give step-by-step solution with explanation and final answer:3. (a) Machines in a repair station arrive at rate of forty
per hour and workman can cope with sixty per
hour for an eight-hour day. You are required to
calculate.
(i) The average time in the system.
(ii) The average length of the queue of
machines that form from time to time.
(iti) The implied cost of machine’s time if owner
of the system has rejected a faster service
which could raise cost by Rs. 800 per day
and would raise the service to eighty per
hour. (2+2+4=8)
This is AI generated Response.
Asked by: Test User 100171
Created at: 2025-05-13 20:19:49
Final Answer:
RenderedRaw Text
Did you like this answer?
Let's solve each part step by step.
---
### **Given Data**
- Arrival rate (\(\lambda\)) = 40 per hour
- Service rate (\(\mu\)) = 60 per hour
- System works for 8 hours a day
This is a classic **M/M/1 queue** (single server, Poisson arrivals, exponential service time).
---
## **1. The average time in the system (\(W\))**
For an M/M/1 system:
\[
W = \frac{1}{\mu - \lambda}
\]
Substitute values:
\[
\mu = 60, \quad \lambda = 40
\]
\[
W = \frac{1}{60 - 40} = \frac{1}{20} \text{ hours} = 3 \text{ minutes}
\]
**Answer:**
**Average time in the system = 3 minutes**
---
## **2. The average length of the queue (\(L_q\))**
\[
L_q = \frac{\lambda^2}{\mu(\mu - \lambda)}
\]
Substitute values:
\[
L_q = \frac{40^2}{60 \times (60-40)} = \frac{1600}{60 \times 20} = \frac{1600}{1200} = 1.33
\]
**Answer:**
**Average length of the queue = 1.33 machines**
---
## **3. Implied cost of machine's time (Cost analysis if faster service is rejected)**
If owner rejects faster service (from 60/hr to 80/hr) which would cost Rs. 800 more per day, what is the implied cost per machine per hour?
### **Step 1: Calculate Average Time Saved per Machine with Faster Service**
- New service rate, \(\mu' = 80\) per hour
\[
W' = \frac{1}{\mu' - \lambda} = \frac{1}{80-40} = \frac{1}{40} \text{ hours} = 1.5 \text{ minutes}
\]
- Old average time in system = 3 minutes (from above)
- New average time in system = 1.5 minutes (from above)
- **Time saved per machine** = \(3 - 1.5 = 1.5\) minutes = \(0.025\) hours
### **Step 2: Find Total Time Saved in a Day**
- Number of arrivals per day = \(40 \times 8 = 320\) machines
- **Total time saved per day:**
\[
320 \times 0.025 = 8 \text{ hours}
\]
### **Step 3: Implied Cost per Hour**
- Cost to save 8 hours = Rs. 800
- **Implied cost per hour:**
\[
\text{Implied cost per hour} = \frac{800}{8} = Rs. 100 \text{ per hour}
\]
---
## **Final Answers (Summary)**
1. **Average time in the system:**
\(3\) minutes
2. **Average length of the queue:**
\(1.33\) machines
3. **Implied cost of machine's time:**
**Rs. 100 per hour**
---
**Let me know if you want detailed formulas or further explanations!**
VIPSolutions focuses on clear, step‑by‑step explanations so you can learn quickly. Whether you need an AI‑generated walkthrough or a short hint to get unstuck, each solution is organized for fast reading and easy review later.
Search similar questions, compare approaches, and bookmark the best answers for revision. Our goal is simple: quick, reliable study help that feels natural—not noisy.