Give step-by-step solution with explanation and final answer: A surveyor measures a distance of 3 0 0 m using a chain that is 0 . 1 m too long per 3 0 m . Calculate the actual distance.
Question:
Give step-by-step solution with explanation and final answer: A surveyor measures a distance of 3 0 0 m using a chain that is 0 . 1 m too long per 3 0 m . Calculate the actual distance.
This is AI generated Response.
Asked by: naveen
Created at: 2025-10-07 13:05:39
Asked by: naveen
Created at: 2025-10-07 13:05:39
Final Answer:
Rendered
Raw Text
Did you like this answer?
# Problem Statement
A surveyor measures a distance of **300 m** using a chain that is **.1 m too long per 30 m**. Calculate the **actual distance**.
---
# Step-by-Step Solution
## 1. Understand the Error
- **Measured Length of Chain:** Each "30 m" chain is actually **30.1 m** long (since .1 m too long).
- When the surveyor thinks they are measuring 30 m, they are actually measuring 30.1 m.
## 2. Calculate Correction Factor
**Correction Factor** = Actual length / Measured length
For each 30 m measured, the actual length covered is 30.1 m.
So,
\[
\text{Actual distance per measured 30 m} = 30.1\ \text{m}
\]
## 3. Find How Many Chains Were Used
\[
\text{Number of chains laid} = \frac{\text{Measured distance}}{\text{Nominal chain length}}
\]
\[
= \frac{300\ \text{m}}{30\ \text{m}} = 10
\]
## 4. Calculate Actual Distance
Each chain actually measures 30.1 m, so:
\[
\text{Actual distance} = \text{Number of chains} \times \text{Actual length of chain}
\]
\[
= 10 \times 30.1 = 301\ \text{m}
\]
---
# Final Answer
\[
\boxed{301\ \text{m}}
\]
**The actual distance is 301 m.**