give full answer and give final summaryThis question include multiple subquestions, in order to earn full credit, answer all subquestions. Show your calculation or Excel output. a) What is the distance between Ogden and Lobbock locations? (10 points) b) What is the cost to transport 400 tons of material between the Springfild and Seattle location? (10 points) ©) What is the optimal location for the Super Assembly Center? (10 points) d) What is the minimized shipping cost that satisfies all market demand? (10 points) Amanufacturer of cat towers wishes to locate a super assembly facility to meet their cat tower assembly needs for the next millennium. Currently, carpet, cylinders, yarn and fasteners are purchased in bulk from suppliers in North Haverbrook, Ogden, and Springfield in the quantities shown in the table. The super assembly facility would ship to distribution centers located in Seattle, Lubback, Nashville, and Philadelphia. The locations of all of these cities on an x-y grid, transportation costs on a ton per mile basis, and total tonnage are all contained in the table. Transportation Cost Sources/Markets Quantity in Tons (Dn) Xn Yn $/ton mile (Fn) Supply North Haverbrook 1.1 650 700 1200 Ogden 1.2 450 250 600 springfield 1.4 400 225 825 Market Seattle 2.25 300 50 1200 Lubbock 2.25 200 450 300 Nashville 2.25 500 800 250 Philadelphia 2.25 500 950 1100
Question:
give full answer and give final summary
This question include multiple subquestions, in order to earn full credit, answer all subquestions. Show your calculation or Excel
output.
a) What is the distance between Ogden and Lobbock locations? (10 points)
b) What is the cost to transport 400 tons of material between the Springfild and Seattle location? (10 points)
©) What is the optimal location for the Super Assembly Center? (10 points)
d) What is the minimized shipping cost that satisfies all market demand? (10 points)
Amanufacturer of cat towers wishes to locate a super assembly facility to meet their cat tower assembly needs for the next
millennium. Currently, carpet, cylinders, yarn and fasteners are purchased in bulk from suppliers in North Haverbrook, Ogden, and
Springfield in the quantities shown in the table. The super assembly facility would ship to distribution centers located in Seattle,
Lubback, Nashville, and Philadelphia. The locations of all of these cities on an x-y grid, transportation costs on a ton per mile basis,
and total tonnage are all contained in the table.
Transportation Cost
Sources/Markets Quantity in Tons (Dn) Xn Yn
$/ton mile (Fn)
Supply
North Haverbrook 1.1 650 700 1200
Ogden 1.2 450 250 600
springfield 1.4 400 225 825
Market
Seattle 2.25 300 50 1200
Lubbock 2.25 200 450 300
Nashville 2.25 500 800 250
Philadelphia 2.25 500 950 1100