building and interest expense are wrong.Wildhorse Landscaping began construction of a new plant on December 1, 2025 (all amounts in thousands). On this date, the company
purchased a parcel of land for ¥147,340 in cash. In addition, it paid ¥2,120 in surveying costs and ¥4,240 for a title insurance policy. An
old dwelling on the premises was demolished at a cost of ¥3,180, with ¥1,060 being received from the sale of materials.
Architectural plans were also formalized on December 1, 2025, when the architect was paid ¥31,800. The necessary building permits
costing ¥3,180 were obtained from the city and paid for on December 1 as well. The excavation work began during the first week in
December with payments made to the contractor in 2026 as follows.
Date of Payment ~~ Amount of Payment
March 1 ¥254,400
May 1 349,800
July 1 63,600
The building was completed on July 1, 2026.
To finance construction of this plant, Wildhorse borrowed ¥636,000 from the bank on December 1, 2025. Wildhorse had no other
borrowings. The ¥636,000 was a 10-year loan bearing interest at 8%. Excess funds from the loan were invested during 2025 and
earned ¥2,120. During 2026, the excess funds from the loan earned ¥1,060.
Compute the balance in each of the following accounts at December 31, 2025, and December 31, 2026. (Round answers to 0 decimal
places, eg. 5,275)
December 31,2025 December 31,2026
a |
Question:
give all answer with step by step answer and give final summary
building and interest expense are wrong.Wildhorse Landscaping began construction of a new plant on December 1, 2025 (all amounts in thousands). On this date, the company
purchased a parcel of land for ¥147,340 in cash. In addition, it paid ¥2,120 in surveying costs and ¥4,240 for a title insurance policy. An
old dwelling on the premises was demolished at a cost of ¥3,180, with ¥1,060 being received from the sale of materials.
Architectural plans were also formalized on December 1, 2025, when the architect was paid ¥31,800. The necessary building permits
costing ¥3,180 were obtained from the city and paid for on December 1 as well. The excavation work began during the first week in
December with payments made to the contractor in 2026 as follows.
Date of Payment ~~ Amount of Payment
March 1 ¥254,400
May 1 349,800
July 1 63,600
The building was completed on July 1, 2026.
To finance construction of this plant, Wildhorse borrowed ¥636,000 from the bank on December 1, 2025. Wildhorse had no other
borrowings. The ¥636,000 was a 10-year loan bearing interest at 8%. Excess funds from the loan were invested during 2025 and
earned ¥2,120. During 2026, the excess funds from the loan earned ¥1,060.
Compute the balance in each of the following accounts at December 31, 2025, and December 31, 2026. (Round answers to 0 decimal
places, eg. 5,275)
December 31,2025 December 31,2026
a |
This is AI generated Response.
Asked by: sreegeeth
Created at: 2025-11-07 13:54:26
Final Answer:
RenderedRaw Text
Did you like this answer?
Let's solve the problem **step by step** for each required amount:
---
## 1. **Land (Dec 31, 2025 & Dec 31, 2026)**
Land capitalized cost includes:
- Purchase price: ¥147,340
- Surveying: ¥2,120
- Title insurance: ¥4,240
- Demolition cost: ¥3,180
- Less: Salvage from old materials: (¥1,060)
**Land Cost Calculation:**
\[
\text{Land Cost} = 147,340 + 2,120 + 4,240 + 3,180 - 1,060 = \boxed{155,820}
\]
*Land does not change in 2026.*
---
## 2. **Buildings (Dec 31, 2025 & Dec 31, 2026)**
### **2025:**
Costs incurred in2025:
- Architect: ¥31,800
- Permits: ¥3,180
\[
\text{Building Cost (2025)} = 31,800 + 3,180 = \boxed{34,980}
\]
### **2026:**
Add payments to contractor:
- March 1: ¥254,400
- May 1: ¥349,800
- July 1: ¥63,600
\[
\text{Total 2026 Payments} = 254,400 + 349,800 + 63,600 = 667,800
\]
Add 2025 costs:
\[
\text{Building Cost before interest} = 34,980 + 667,800 = 702,780
\]
**Add capitalized interest (see below for calculation):**
---
## 3. **Interest Expense (Dec 31, 2025 & Dec 31, 2026)**
### **2025:**
- Loan on Dec 1, 2025: ¥636,000 at 8% interest
- Interest for 1 month = ¥636,000 × 8% × (1/12) = ¥4,240
- Less: Investment income = ¥2,120
**Capitalizable interest (2025):**
\[
\text{Interest capitalized} = 4,240 - 2,120 = \boxed{2,120}
\]
**Interest expense (2025):**
- All interest is capitalized since building under construction.
**So, Interest Expense (2025) = **
### **2026:**
We need to capitalize interest on average accumulated expenditures (AAE).
#### **Average Accumulated Expenditures (AAE):**
- March 1: ₹254,400 × (4/12) = 84,800
- May 1: ₹349,800 × (2/12) = 58,300
- July 1: ₹63,600 × (/12) = (building completed on July 1, so no months outstanding)
\[
\text{AAE} = 84,800 + 58,300 = 143,100
\]
But, for capitalizing interest, we actually use the weighted-average expenditures method. Let's apply the months outstanding for each payment:
- **March 1:** 10 months outstanding (March–Dec): \(254,400 \times \frac{10}{12} = 211,999.999 \approx 212,000\)
- **May 1:** 8 months outstanding (May–Dec): \(349,800 \times \frac{8}{12} = 233,200\)
- **July 1:** 6 months outstanding (July–Dec): \(63,600 \times \frac{6}{12} = 31,800\)
\[
\text{AAE (2026)} = 212,000 + 233,200 + 31,800 = 477,000
\]
#### **Interest to Capitalize (2026):**
\[
\text{Interest to Capitalize} = 477,000 \times 8\% = 38,160
\]
#### **Actual Interest Incurred (2026):**
- Loan outstanding all year: \(636,000 \times 8\% = 50,880\)
#### **Interest Expense (2026):**
\[
\text{Interest Expense (2026)} = \text{Actual Interest} - \text{Interest Capitalized}
= 50,880 - 38,160 = 12,720
\]
---
### **Building Cost at Dec 31, 2026**
Add capitalized interest for 2025 and 2026:
\[
\text{Capitalized Interest} = 2,120 + 38,160 = 40,280
\]
\[
\text{Total Building Cost (2026)} = 702,780 + 40,280 = \boxed{743,060}
\]
---
## **Summary Table**
| | Dec 31, 2025 | Dec 31, 2026 |
|-------------------------|--------------|--------------|
| a. Land | 155,820 | 155,820 |
| b. Buildings | 34,980 | 743,060 |
| c. Interest Expense | | 12,720 |
---
### **Final Summary**
- **Land cost** (same both years): **¥155,820**
- **Building cost**: **¥34,980** at 2025; **¥743,060** at 2026 (includes capitalized interest).
- **Interest expense**: **¥** at 2025 (all capitalized); **¥12,720** at 2026 (difference between actual interest and capitalized interest).
Let me know if you need explanation for any part!
Question:
where is interest rate dec 31 25 rate?
This is AI generated Response.
Asked by: sreegeeth
Created at: 2025-11-07 13:56:46
Final Answer:
RenderedRaw Text
Did you like this answer?
## Interest Rate Calculation on December 31, 2025
### **Interest Rate Explanation**
Wildhorse Landscaping took out a loan of ¥636,000 at an interest rate of 8% for a period of 10 years. The interest calculation for the first month (December 2025) is as follows:
### **Calculation Steps for December 31, 2025**
1. **Loan Amount**: ¥636,000
2. **Interest Rate**: 8% per annum
3. **Interest Calculation for 1 Month**:
\[
\text{Interest for December} = \text{Loan Amount} \times \left(\frac{\text{Interest Rate}}{12}\right)
\]
\[
\text{Interest for December} = 636,000 \times \left(\frac{8\%}{12}\right) = 636,000 \times \frac{0.08}{12} = 4,240
\]
### **Interest Expense and Capitalization**
- **Total Interest for December 2025**: ¥4,240
- **Less Investment Income Earned**: ¥2,120
- **Capitalizable Interest**:
\[
\text{Capitalized Interest} = \text{Interest for December} - \text{Investment Income}
\]
\[
\text{Capitalized Interest} = 4,240 - 2,120 = 2,120
\]
### **Summary for December 31, 2025**
- **Interest Expense for December 2025**:
- Since all interest is capitalized during construction, the interest expense recognized on the income statement for the year 2025 is **¥0**.
- **Capitalized Interest**: **¥2,120**.
---
### **Final Summary of Interest Rate on December 31, 2025**
- **Loan Amount**: ¥636,000
- **Interest Rate**: 8% per annum
- **Interest for December**: ¥4,240
- **Investment Income**: ¥2,120
- **Capitalized Interest**: ¥2,120
- **Interest Expense**: ¥0 (all capitalized)
If you have any further questions or need additional details, feel free to ask!
Question:
give 2 sentence summary in each steps
This is AI generated Response.
Asked by: sreegeeth
Created at: 2025-11-07 14:00:32
Final Answer:
RenderedRaw Text
Did you like this answer?
# Summary of Calculations for Wildhorse Landscaping
## 1. Land Cost Calculation
The total cost of land includes the purchase price, surveying costs, title insurance, and demolition costs, minus the salvage value. The final land cost at both December 31, 2025, and December 31, 2026, is **¥155,820**.
## 2. Building Cost Calculation
In 2025, the building costs consist of architectural fees and permit expenses, totaling **¥34,980**. By the end of 2026, after adding contractor payments and capitalized interest, the total building cost reaches **¥743,060**.
## 3. Interest Expense Calculation
For December 2025, the interest incurred on the loan is **¥4,240**, reduced by investment income of **¥2,120**, resulting in capitalized interest of **¥2,120**. In 2026, the actual interest expense recognized is **¥12,720** after accounting for capitalized interest.
---
### **Final Summary**
- **Land Cost**: Remains at **¥155,820** for both periods.
- **Building Cost**: Increases from **¥34,980** in 2025 to **¥743,060** in 2026.
- **Interest Expense**: **¥0** for 2025 (all capitalized) and **¥12,720** for 2026.