A company wants to determine its reorder point
(
R
)
.
Demand is variable and they want to build a safety stock into R
.
If the average daily demand is
1
7
,
the lead time is
4
days, the desired service level is
9
5
%
,
and the standard deviation of daily demand is
3
,
which of the following is the desired value of R
?
(
round to the nearest whole number
)
Options:
6
1
6
6
1
6
6
7
3
FORECASTING
Below are the actual demands for an item for a six
-
month period
(
January through Junel Your supervisor wants you to test four forecasting methods.
Answer questions
2
0
-
2
3
by referencing the following table.
\
table
[
[
Month
,
Actual Demand
]
,
[
January
,
1
2
0
]
,
[
February
,
1
3
0
]
,
[
March
,
1
5
5
]
,
[
April
,
1
7
3
]
,
[
May
,
1
6
7
]
,
[
June
,
1
8
0
]
]
Question
2
0
Using least squares regression analysis, you get a regression model as:
Y
=
1
1
0
.
7
1
1
.
8
x
what would be your estimate of the demand for July?
(
answer to the nearest whole number
)
integer, decimat or E notation allowed
Question
2
1
If a three
-
month moving average forecasting method is used, what would be your forecast for June?
(
answer to the nearest whole number
)
Integer, decimal of I notation allowed
Question:
A company wants to determine its reorder point
(
R
)
.
Demand is variable and they want to build a safety stock into R
.
If the average daily demand is
1
7
,
the lead time is
4
days, the desired service level is
9
5
%
,
and the standard deviation of daily demand is
3
,
which of the following is the desired value of R
?
(
round to the nearest whole number
)
Options:
6
1
6
6
1
6
6
7
3
FORECASTING
Below are the actual demands for an item for a six
-
month period
(
January through Junel Your supervisor wants you to test four forecasting methods.
Answer questions
2
0
-
2
3
by referencing the following table.
\
table
[
[
Month
,
Actual Demand
]
,
[
January
,
1
2
0
]
,
[
February
,
1
3
0
]
,
[
March
,
1
5
5
]
,
[
April
,
1
7
3
]
,
[
May
,
1
6
7
]
,
[
June
,
1
8
0
]
]
Question
2
0
Using least squares regression analysis, you get a regression model as:
Y
=
1
1
0
.
7
1
1
.
8
x
what would be your estimate of the demand for July?
(
answer to the nearest whole number
)
integer, decimat or E notation allowed
Question
2
1
If a three
-
month moving average forecasting method is used, what would be your forecast for June?
(
answer to the nearest whole number
)
Integer, decimal of I notation allowed
This is AI generated Response.
Asked by: Test User 100103
Created at: 2025-05-06 07:22:37
Final Answer:
RenderedRaw Text
Did you like this answer?
Let's answer your questions step by step:
---
### **Reorder Point (R) Calculation**
Given:
- Average daily demand (d) = **17**
- Lead time (L) = **4 days**
- Standard deviation of daily demand (σd) = **3**
- Desired service level = **95%**
#### **Step 1: Calculate mean demand during lead time**
\[
\text{Mean demand during lead time} = d \times L = 17 \times 4 = 68
\]
#### **Step 2: Calculate safety stock**
- For a 95% service level, the z-score (**z**) ≈ **1.65** (from z-tables).
\[
\text{Standard deviation during lead time} = \sigma_{LT} = \sigma_d \times \sqrt{L} = 3 \times 2 = 6
\]
\[
\text{Safety stock} = z \times \sigma_{LT} = 1.65 \times 6 = 9.9 \approx 10
\]
#### **Step 3: Calculate reorder point**
\[
R = \text{Mean demand during lead time} + \text{Safety stock} = 68 + 10 = 78
\]
But let's check the answer options: **61, 66, 67, 73**
It seems we need to double check the z-value. Some use **1.645** for 95%.
\[
\text{Safety stock} = 1.645 \times 6 = 9.87 \approx 10
\]
Still, **68 + 10 = 78**.
But none of the options match. Let's check if the question wants the mean, or just the safety stock, but that seems unlikely.
**Are you sure about the average daily demand and options?**
But, **assuming the options are correct**, and the closest to our calculation is **73**.
So,
---
**Answer: The desired value of R is:** **73**
---
## **Forecasting Questions**
### **20. Regression Forecast for July**
Given regression model:
\[
Y = 110.7 + 11.8x
\]
Where x = **1** for January, **2** for February, ..., **7** for July.
So, for July, x = **7**:
\[
Y_{July} = 110.7 + 11.8 \times 7 = 110.7 + 82.6 = 193.3
\]
**Rounded to the nearest whole number: 193**
---
### **21. Three-month Moving Average Forecast for June**
Three-month moving average for **June** uses March, April, and May actuals.
- March: **155**
- April: **173**
- May: **167**
\[
\text{Moving average} = \frac{155 + 173 + 167}{3} = \frac{495}{3} = 165
\]
**Answer: 165**
---
## **Summary of Answers**
1. **Reorder Point (R):** **73**
2. **Regression forecast for July:** **193**
3. **Three-month moving average forecast for June:** **165**
Let me know if you need solutions for the other forecasting questions!
VIPSolutions focuses on clear, step‑by‑step explanations so you can learn quickly. Whether you need an AI‑generated walkthrough or a short hint to get unstuck, each solution is organized for fast reading and easy review later.
Search similar questions, compare approaches, and bookmark the best answers for revision. Our goal is simple: quick, reliable study help that feels natural—not noisy.